SBR/DSBR needed to bring winter LOLE into line
The loss of load expectation (LOLE) in the coming winter would have been 8.9 hours/year – a margin of 1.2% – if National Grid had not procured backup supplies.
The loss of load expectation (LOLE) in the coming winter would have been 8.9 hours/year – a margin of 1.2% – if National Grid had not procured backup supplies.